Impact of Gyeongin Port Yellow Sea water gate freshwater discharge on the turbulence dynamics near Yeongjong Bridge.

Figure 1. (a) Map showing the model domain and bathymetry for Gyeonggi Bay, (b) enlarged grid of the regions around Gyeongin Port, and (c) near the Ara Yellow sea gate. In (a) and (b), red triangles indicate tide stations. Yellow square indicates the mooring (M01). In (b) and (c), the red arrow indicates the direction of water discharge from sea gate.

Impact of Gyeongin Port Yellow Sea water gate freshwater discharge on the turbulence dynamics near Yeongjong Bridge.

Figure 2. The blue and red bars represent the monthly mean discharges from the Han river and the sea gate. Black solid line indicate the ratio of Ara sea gate and Han River discharges. The influence of the discharge from the sea gate increases during the winter period.

Impact of Gyeongin Port Yellow Sea water gate freshwater discharge on the turbulence dynamics near Yeongjong Bridge.

Figure 3. Time average model results in current velocities over 40 days. (a) and (c) represent the results at the surface and bottom layers without the application of the sea gate, while (b) and (d) represent the surface and bottom layers with the application of the sea gate. Red circles show the analysis regions (near the P1). The white streamlines indicate the flow patterns.

Impact of Gyeongin Port Yellow Sea water gate freshwater discharge on the turbulence dynamics near Yeongjong Bridge.

Figure 4. (a) Difference of residual current vector at P1 (blue circle in Figure 1b) between with and without the discharge. (b) Water discharge from the sea gate

Impact of Gyeongin Port Yellow Sea water gate freshwater discharge on the turbulence dynamics near Yeongjong Bridge.

Figure 5. Time average over 40 days for the vertical residual current velocities at P1 with and without the discharge from the sea gate.

Project
Hydraulic Phenomena Survey of Incheon Port (Phase 3)
Funded by
Incheon Port Authority